The RS 850 tubular column system comes
with 3 m, 6 m or 9 m columns as standard, with standard pipeline lengths.
Different tubular columns for setting up the boom pedestal and arm
assembly are not required. The double M tubular column profile requires
only one simple, square cut-out (1 m x 1 m) in the floors. By using an
adapter, existing booms can continue to be used with the RS 850 tubular
column.